Colony Park Road Extension

New Smyrna Beach, Florida

Consor provided preliminary engineering, final design, and permitting services for the extension of Colony Park Road to Pioneer Trail, a distance of 0.7 miles. Design services included roadway, intersection, drainage, lighting, permitting, utilities, structures, signing and pavement marking, traffic control and landscaping. The project also included typical section development, preliminary construction costs, final design, preparation of construction plans, technical specifications, special provisions, agency permits, and public involvement for this new roadway alignment. The design was for a two-lane curb and gutter typical section with a 10-ft. sidewalk on one side. The project also included milling and resurfacing and the addition of a left turn lane on Pioneer Trail. Coordination was required with the City’s trail design consultant in order to provide a trail crossing on the Colony Park Road extension.